Boeing
Renewable Energy Project
“Our selection of Low Carbon Energy for this project was ideal as their team worked closely with us to satisfy the needs of Boeing and provide a solution that met our requirements and resulted in the generation of around 85Kw of clean energy and the saving of 37 tonnes of Co2 annually.
Low Carbon Energy proved they not only have the expertise to design a solution that will suit our requirements but also the capacity to fulfil every aspect of our renewable energy project, from modelling and procurement to installation and commissioning. We look forward to developing this relationship in the future.”
Mohamed Ehtiawesh, Electrical Engineer, Mott MacDonald
Why should a net-zero
strategy be a priority?
strategy be a priority?